The ZOOMLION K56X-6RZ truck-mounted concrete pump integrates
advanced technology and superior performance, serving as a reliable
assistant in the concrete construction field. With its reliable
quality and high-efficiency operation, it injects strong momentum
into various engineering projects.
- High-Efficiency Pumping: Equipped with an advanced pumping system, it delivers a large
output volume, enabling rapid concrete placement and significantly
shortening the construction cycle.
- Flexible Boom: With a 56m vertical boom and 51m horizontal boom, it extends
flexibly to reach complex construction areas easily, offering a
wide coverage range.
- High Stability: Optimized overall design ensures stable and reliable operation,
reducing shaking and guaranteeing construction safety and quality.
Parameter | Details |
---|
Model | ZOOMLION K56X-6RZ |
Production Date | April 2025 |
Vertical Boom Height | 56m |
Horizontal Boom Height | 51m |
Theoretical Concrete Output | 180m³/h |
Concrete Pumping Pressure | 11.3MPa |
Vehicle Kerb Mass | 32,700kg |
Widely used in large infrastructure projects requiring concrete
placement, such as high-rise buildings, bridge construction, tunnel
engineering, and water conservancy facilities.
Customized solutions are available for boom configuration, pumping
capacity adjustment, and overall vehicle dimensions to meet
specific construction needs and diverse application scenarios.
Q1: How to perform daily maintenance on the equipment?
A1: Regularly inspect for loose bolts at boom connection points;
monitor the hydraulic oil level and cleanliness of the pumping
system, and replace hydraulic oil as specified; check wear on
vulnerable parts (e.g., pistons, delivery pipes) and replace them
as needed; keep the water tank clean and periodically remove
impurities; lubricate all lubrication points according to the
maintenance manual.
Q2: How to report a fault with the equipment?
A2: Contact your local ZOOMLION after-sales service center directly,
providing the equipment serial number and fault description.
Alternatively, call the ZOOMLION official customer service hotline
to report the issue in detail, and professional maintenance
personnel will be dispatched for on-site repair.
Q3: What are the requirements for the construction site?
A3: The construction site must be flat and solid enough to bear the
equipment’s self-weight and operational loads. Sufficient space
must be reserved for smooth boom deployment and vehicle
parking/movement. The site should be free of obstacles like
high-voltage lines to ensure safe operation.
Q4: Why is the equipment’s fuel consumption high?
A4: Possible causes include engine faults (e.g., poor fuel injector
atomization), leaks in the pumping system leading to extra energy
loss, frequent or improper boom movements increasing unnecessary
energy consumption, and poor site road conditions with frequent
stops/starts. Contact professionals to inspect the engine and
pumping system, and optimize operation procedures to improve
efficiency.
Q5: What are the vulnerable parts of the equipment? What is the
approximate replacement cycle?
A5: Common vulnerable parts include concrete delivery pipes, pistons,
S-valves, spectacle plates, and cutting rings. Replacement cycles
vary by construction conditions and concrete output volume:
- Pistons: Inspect/replace after pumping 30,000–50,000 m³ of
concrete.
- Delivery pipes: Replace after pumping 80,000–100,000 m³ of
concrete.
- Spectacle plates/cutting rings: Monitor wear and replace after
pumping 50,000–80,000 m³ of concrete.
Actual cycles should be determined based on specific usage.